Welcome to our facility.
Pre-assembly area. Cutting machining, etc……
Assembly area # 1
Raw material pre-fabrication area
Laser Machines
Fabrication of Walkway structures
Powder Coating Building
Parts entering Powder Coating Oven
Parts waiting for Powder Coating
Walkway side panels waiting to be painted
Special Coating application
Assembly Jig
Passenger Gantry fit-checked to a mock-up DASH-8 aircraft silhouette
Build area # 1. Assembly jig and mock-up Boarding Ramp in the background
Canopy Hood in jig for final assembly
Q-Ramp in initial design stage
Q-Ramp being fitted with height adjustment device
Final mock-up of Q-Ramp
Assembly area # 2 …..Six Regional Boarding Ramps waiting for fitment of electronics & hydraulics
RBR’s being fitted with electronic control circuitry
RBR’s being fitted with Hydraulic Drive Systems
Final Assembly of Regional Boarding Ramps (RBR’s)
Six RBR’s ready to ship to Miami Int’l Airport
Assembly area # 3 – Mobile Boarding Ramp in development for ANA in Japan
Assembly area # 3 – Two Passenger Gantries in final inspection for Qantas Airlines
Passenger Walkway Transition Decks waiting to ship to Los Angeles Int’l Airport
Custom Stainless Steel Commute-A-Walk passenger walkway for Nagasaki seaport in Japan.
Walkway sections waiting for “Q C” inspection before shipping
Custom Walkway for Delta Airlines “fully assembled” for inspection
Shipping wing of the factory
Toronto Passenger Walkway & 3 RBR’s “fully assembled” for inspection . Client: American Airlines
Custom Switch-back Gantry for American Airlines. Gantry will interface the new EMB-175 aircraft to Regional Boarding Ramps
Delta Airlines LaGuardia Airport 3rd level Bus Ramp “fully assembled” outside the factory for inspection by the client